Fluidcon Walsum10

In June 2009 in the construction of Block 10 of Walsum thermal power station, workings on the pulverize fuel ash management were incorporated with workings on fluidization management. Besides prefabricated spools, the welds for assembling were carried out as adaptations at the locality.

New prefabrication area in Bakum-Harme near Vechta

Our new prefabrication area conveniently situated just next to the motorway (Autobahn) A1 will be constructed in Autumn/Winter 2009. Prefabrication of spools for the new construction sites in Northern Germany will take place there.