{"id":5147,"date":"2022-09-20T06:40:14","date_gmt":"2022-09-20T06:40:14","guid":{"rendered":"https:\/\/imr-anlagenbau.com\/new-contract-signed-for-kusile-project-in-south-africa\/"},"modified":"2022-10-18T04:50:40","modified_gmt":"2022-10-18T04:50:40","slug":"new-contract-signed-for-kusile-project-in-south-africa","status":"publish","type":"post","link":"https:\/\/imr-anlagenbau.com\/de\/new-contract-signed-for-kusile-project-in-south-africa\/","title":{"rendered":"New Contract signed for Kusile Project in South Africa"},"content":{"rendered":"<p>After two years of successful Business dealing in South Africa on the fourth-largest coal-fired power station in the world with the\u00a0total capacity of 4800 MW, IMR Hamburg has signed a new and more extensive Contract for Unit 2.<\/p>\n<blockquote><p>IMR will provide the Kusile Boiler Project with a Labour Service and Management of the scope of works to install the High Pressure and lntegral Pipework systems for Unit 2 of the Kusile Power Station Project.<\/p><\/blockquote>\n<p>In the next period, IMR will be doing welding, inspection and testing on the\u00a0site of the HP\/lntegral Pipe work Systems.<\/p>\n<p>Also, IMR Hamburg will provide installation and inspection on site of the associated supports for the HP Integral Pipe work systems as follow: Economiser, Evaporator, Reticulation Circuit, Super Heater System, Re-Heater System, Pressure System, Steam Soot blowing System, HP Super Heater System, IP Spray System, Steam Generator Drains System, Check line and Temporary line for HT.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>After two years of successful Business dealing in South Africa on the fourth-largest coal-fired power station in the world with the\u00a0total capacity of 4800 MW, IMR Hamburg has signed a new and more extensive Contract for Unit 2. IMR will provide the Kusile Boiler Project with a Labour Service and Management of the scope of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5093,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[34],"tags":[36],"class_list":["post-5147","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nachrichten","tag-imr-hamburgkusilekusile-projectsuedafrika"],"_links":{"self":[{"href":"https:\/\/imr-anlagenbau.com\/de\/wp-json\/wp\/v2\/posts\/5147","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/imr-anlagenbau.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/imr-anlagenbau.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/imr-anlagenbau.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/imr-anlagenbau.com\/de\/wp-json\/wp\/v2\/comments?post=5147"}],"version-history":[{"count":0,"href":"https:\/\/imr-anlagenbau.com\/de\/wp-json\/wp\/v2\/posts\/5147\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/imr-anlagenbau.com\/de\/wp-json\/wp\/v2\/media\/5093"}],"wp:attachment":[{"href":"https:\/\/imr-anlagenbau.com\/de\/wp-json\/wp\/v2\/media?parent=5147"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/imr-anlagenbau.com\/de\/wp-json\/wp\/v2\/categories?post=5147"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/imr-anlagenbau.com\/de\/wp-json\/wp\/v2\/tags?post=5147"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}