WHV EBL Ansicht
In December, 2009 the order was given to IMR for manufacturing and erection of IP, LP and partial HP piping systems of the project „New building of KW Wilhelmshaven Electrabel W1“. The customer Hitachi Power Europe GmbH (HPE) from Duisburg builds there essential components of the new 800 MW coal power plant for the belgian energy provider Electrabel.
The order contains in the main focus pipes in the machine house with e.g. extraction steam, as well as auxiliary systems of various media there and in the boiler house as well as in the media wing. Besides classical, low and higher alloyed pipes within the HP part P91 (1.4903) and P92 (1.4901) are to be welded as material.