P92 WPQ with wall thickness range over 120mm
In the competition as a system supplier for assembly and welding technology of e.g. fresh steam pipes and turbine connections strives the IMR further at
In the competition as a system supplier for assembly and welding technology of e.g. fresh steam pipes and turbine connections strives the IMR further at
WHV EBL Ansicht In December, 2009 the order was given to IMR for manufacturing and erection of IP, LP and partial HP piping systems of
October 2009: In Cooperation with Hitachi Power Europe GmbH IMR has successfully introduced different Software-Solutions from the Piping Solution of Intergraph PP&M Germany GmbH. With
In May 2009 auditing of procedures Rohr 33,7×8.0mm and 396*30mm for the material X 10 CrWMoV 9-2 material- Nr. 1.4901 were tested through weld verification
Our new prefabrication area conveniently situated just next to the motorway (Autobahn) A1 will be constructed in Autumn/Winter 2009. Prefabrication of spools for the new
Im Mai 2013 hat die IMR an der Revision teilgenommen. In diesem Zeitraum wurden einige Russbläser sowie zugehörige Rohrleitungen angepaßt und ergänzt. Die Fehlerquote von
The company IMR Hamburg has successfully extended the project contracts for the installation of low pressure and high pressure piping on Kusile with the contractors
Due to the 1st Anniversary of Business dealing on the South Africa territory, the employees of our Company have organised the weekend trip on the
June 2014: IMR Hamburg is executing during the erection of high pressure pipelines in the Kusile Power Station successful the Skill Transfer to the local
The sophisticated processing of the material, “T24” 7CrMoVTiB10-10 IMR succeeded in June 2013 at a new build coal fired power plant project in the netherlands.
From August 2013 the IMR service engineers and a welding engineer are at work on the Kusile power plant construction project. Ambitious objectives are to
As part of the revision works superheater made from “VM12” were installed by IMR Hamburg d.o.o. staff superheater from VM12, coal burners de-and re-installed and