Port Bakar: Reconstruction

Port Bakar Reconstruction Investor: MOL – INA Client: MOL – INA Type: Procurement and construction Period: 2016-2021. Services: Removal of existing inflow-outflow and measuring equipment at the ship terminal Prefabrication and erection of pipes for service media (water, air, nitrogen) through concrete Installation and assembly of new measuring lines and inflow-outflow equipment and connection to […]

Refinery Sisak: Maintenance

Maintenance and revamp of stationary equipment Investor: MOL INA Client: MOL INA Type: Maintenance Period: 2017-2021 Services – IMR Hamburg is responsible for installing and maintenance of: pipelines and pipe fittings heat exchangers, condensers open coolers, air coolers and evaporators vessels and process columns Tanks Reactors Process furnaces Steel structures Other elements of process equipment […]

Topping III: Facility relocation

Relocation of the pipeline below topping III in the Rijeka oil refinery Investor: MOL – INA Client: MOL – INA Type: Procurement and Installation Period: 2018 – 2019. Services: Procurement of necessary equipment and materials Pipes and steelwork prefabrication in our workshop Disassembly of pipes and existing steel structure Erection of steelwork, hangers and support […]

Refinery Rijeka reconstruction

Revamp of atmospheric distillation plant Topping III Investor: MOL INA Client: MOL INA Type: Procurement and construction Period: 2018-2019. Services – IMR Hamburg is responsible for procurement, dismantling and installing: Pipelines and pipe fittings, Open coolers, air coolers and evaporators, Vessels and process columns, Steel structures, Other elements of process equipment

Refinery Rijeka: Reconstruction of crude oil tank supply pipelines

Reconstruction of crude oil tank 331-SA-017 supply pipelines Investor: MOL – INA Client: MOL – INA Type: Procurement and Installation Period: 2020  – Present Services: Procurement and delivery of civil, mechanical and electric equipment and materials Prefabrication of the piping spools Reconstruction of existing pipelines Erection of a new 200m pipelines Anti-corrosive protection and pipeline […]