Port Bakar Reconstruction
Investor: MOL – INA
Client: MOL – INA
Type: Procurement and construction
Period: 2016-2021.
Services:
- Removal of existing inflow-outflow and measuring equipment at the ship terminal
- Prefabrication and erection of pipes for service media (water, air, nitrogen) through concrete
- Installation and assembly of new measuring lines and inflow-outflow equipment and connection to the existing pipelines from the pipe bridge
- Installation of cable trays, laying of instrumentation cables to junction boxes and connections
- Grounding and equipotential bonding of new equipment
- Testing period of six months