Port Bakar: Reconstruction

Port Bakar Reconstruction

Investor: MOL – INA

Client: MOL – INA

Type: Procurement and construction

Period: 2016-2021.

Services:

  • Removal of existing inflow-outflow and measuring equipment at the ship terminal
  • Prefabrication and erection of pipes for service media (water, air, nitrogen) through concrete
  • Installation and assembly of new measuring lines and inflow-outflow equipment and connection to the existing pipelines from the pipe bridge
  • Installation of cable trays, laying of instrumentation cables to junction boxes and connections
  • Grounding and equipotential bonding of new equipment
  • Testing period of six months