Kronospan: Reconstruction of the main gas pipeline

Reconstruction of the main gas pipeline Investor: KRONOSPAN Client: KRONOSPAN Type: Erection Period: 2016 Services: Erection of steel pipelines on the route Radiographic testing of welds Anti-corrosion insulation of burial pipeline on the route Pipeline testing for tightness and strength Pipeline inertization
Refinery Rijeka: Chemical water preparation pipeline reconstruction

Reconstruction of chemical water preparation pipelines Investor: MOL – INA Client: MOL – INA Type: Procurement and construction Period: 2017. Services: Procurement of materials Prefabrication of piping spools and steel Erection of new pipes, H&S and steel Execution of civil works Anti-corrosive protection Commissioning
Refinery Rijeka: Reconstruction and modernization

Process and utility systems reconstruction and modernization Investor: MOL INA Client: MOL INA Type: Procurement and construction Period: 2015-2016. Services: IMR Hamburg is responsible for installing new pipelines, IMR Hamburg has done Procurement and Erection of mentioned lines, The steel construction and installation of the pipe supports also supplied by IMR Hamburg.
Vapor Recovery Unit – procurement and construction

Construction of Vapor Recovery Unit (VRU) Investor: MOL – INA Client: MOL – INA Type: Procurement and construction Period: 2016-2021. Services: Procurement and delivery of equipment and materials Execution of works (construction, mechanical assembly, corrosion protection and thermal insulation, electro-instrumentation) Operator training, commissioning, as-built documentation, prepare and/or collect all necessary documentation for obtaining the Operational […]
Port Bakar: Reconstruction

Port Bakar Reconstruction Investor: MOL – INA Client: MOL – INA Type: Procurement and construction Period: 2016-2021. Services: Removal of existing inflow-outflow and measuring equipment at the ship terminal Prefabrication and erection of pipes for service media (water, air, nitrogen) through concrete Installation and assembly of new measuring lines and inflow-outflow equipment and connection to […]