Polysius AG: Servicearbeiten an verschiedenen Zementanlagen
Wir haben zusammen mit der Polysius AG verschiedene Revisionsarbeiten für Kunden wie die Cemex Ost GmbH aus Rüdersdorf, die Fels-Werke GmbH aus Münchehof, die Schwenk Zement KG aus Bernburg und verschiedene Kunden aus Hamburg, Stendal… durchgeführt. Diese Servicearbeiten wurden wie an Anlagenrohrleitungen auch an Elektrofiltern, Stahlkonstruktionen und mechanischen Ausrüstungen durchgeführt. Auch bei diesen Servicearbeiten waren […]
Power plant Walsum: Construction and commissioning
Construction of new Power Plant Unit 10, 800 MW Investor: Evonik Industries AG Client: Hitachi Power Europe Type: Steam generator Period: 2007-2009 new construction and 2012-2013 turn over Services: LP/IP Detail Engineering Installation of main cooling water pipeline DN2600 Installation of pipelines on pipe racks Installation of LP/IP external pipelines Installation of ash loading system […]
Refinery Rijeka: Reconstruction of crude oil tank supply pipelines
Reconstruction of crude oil tank 331-SA-017 supply pipelines Investor: MOL – INA Client: MOL – INA Type: Procurement and Installation Period: 2020 – Present Services: Procurement and delivery of civil, mechanical and electric equipment and materials Prefabrication of the piping spools Reconstruction of existing pipelines Erection of a new 200m pipelines Anti-corrosive protection and pipeline […]
Refinery Rijeka reconstruction
Revamp of atmospheric distillation plant Topping III Investor: MOL INA Client: MOL INA Type: Procurement and construction Period: 2018-2019. Services – IMR Hamburg is responsible for procurement, dismantling and installing: Pipelines and pipe fittings, Open coolers, air coolers and evaporators, Vessels and process columns, Steel structures, Other elements of process equipment
Topping III: Facility relocation
Relocation of the pipeline below topping III in the Rijeka oil refinery Investor: MOL – INA Client: MOL – INA Type: Procurement and Installation Period: 2018 – 2019. Services: Procurement of necessary equipment and materials Pipes and steelwork prefabrication in our workshop Disassembly of pipes and existing steel structure Erection of steelwork, hangers and support […]
Refinery Sisak: Maintenance
Maintenance and revamp of stationary equipment Investor: MOL INA Client: MOL INA Type: Maintenance Period: 2017-2021 Services – IMR Hamburg is responsible for installing and maintenance of: pipelines and pipe fittings heat exchangers, condensers open coolers, air coolers and evaporators vessels and process columns Tanks Reactors Process furnaces Steel structures Other elements of process equipment […]
Port Bakar: Reconstruction
Port Bakar Reconstruction Investor: MOL – INA Client: MOL – INA Type: Procurement and construction Period: 2016-2021. Services: Removal of existing inflow-outflow and measuring equipment at the ship terminal Prefabrication and erection of pipes for service media (water, air, nitrogen) through concrete Installation and assembly of new measuring lines and inflow-outflow equipment and connection to […]
Vapor Recovery Unit – procurement and construction
Construction of Vapor Recovery Unit (VRU) Investor: MOL – INA Client: MOL – INA Type: Procurement and construction Period: 2016-2021. Services: Procurement and delivery of equipment and materials Execution of works (construction, mechanical assembly, corrosion protection and thermal insulation, electro-instrumentation) Operator training, commissioning, as-built documentation, prepare and/or collect all necessary documentation for obtaining the Operational […]
Refinery Rijeka: Reconstruction and modernization
Process and utility systems reconstruction and modernization Investor: MOL INA Client: MOL INA Type: Procurement and construction Period: 2015-2016. Services: IMR Hamburg is responsible for installing new pipelines, IMR Hamburg has done Procurement and Erection of mentioned lines, The steel construction and installation of the pipe supports also supplied by IMR Hamburg.
Refinery Rijeka: Chemical water preparation pipeline reconstruction
Reconstruction of chemical water preparation pipelines Investor: MOL – INA Client: MOL – INA Type: Procurement and construction Period: 2017. Services: Procurement of materials Prefabrication of piping spools and steel Erection of new pipes, H&S and steel Execution of civil works Anti-corrosive protection Commissioning